Schedule RESOURCE REQUIREMENTS 
Use this function to list the resources
used in a Schedule along with the quantity and cost for each.
The table is read only, there are no values you can change (any price
changes should be applied in Schedule Resources).
If you want to see where a selected resource is being used in the Schedule,
use the Trace function.
Key Features
- Resources are filtered by Type
(Labour only, Material only etc.).
- Schedule resource cost per unit and total cost per Type.
- Rounded Qty & Rounded Cost values to give a better indication
of the order quantity (avoids ordering 22.5 bags of cement!)
- View resource requirements by BOQ or individual Bill.
Notes:
- Resources that have been used in the BOQ but but have
since been removed are displayed in red (with a 0.00
value). These can be deleted in Schedule Resources if
no longer required.
Tips
- Use this function to make sure resources used in the Schedule are
within the cost limits you would expect. If not, use the Trace
function to find out more.
|